• paj banyè

Fiks Pri konpetitif Prefabrike Steel Bailey Bridge Steel Bridge Design Bailey Bridge Construction

Deskripsyon kout:

Modèl alyas: HD200,CB200,ZB200
Single liy: Pont pon lajè nèt: 3.15m.
Maksimòm Longè Free Span: 60.96m
Siplemantè Lajè Single liy: Lajè nèt pon pon: 4.2m.
Maksimòm Longè Free Span: 60.96m
Std. Liy doub: Pont pon lajè nèt: 7.35m.
Maksimòm Longè Span gratis: 45.72m
Panèl dimansyon: 3.048m * 2.134m (twou sant distans)


Pwodwi detay

Tags pwodwi

Nou kwè ke patenarya peryòd tan vaste ka yon rezilta nan bon jan kalite siperyè, pri ajoute sipò, rankont chaje ak kontak pèsonèl pou Pri fiks Konpetitif Prefabrike Steel Bailey Bridge Steel Bridge Design Bailey Bridge Construction, Prensip Nwayo Antrepriz nou an: Prestige la 1st ; garanti; Kliyan an siprèm.
Nou kwè ke patenarya peryòd tan vaste ka yon rezilta nan bon jan kalite siperyè, pri te ajoute sipò, rankont chaje ak kontak pèsonèl pouLachin Bailey Steel prefabrike pon ak Bailey Bridge Pri, Pou travay ak yon manifakti machandiz ekselan, konpayi nou an se pi bon chwa ou. Byenveni ou ak ouvèti fwontyè kominikasyon yo. Nou se patnè ideyal nan devlopman biznis ou epi gade pou pi devan pou koperasyon sensè ou.

Pwodwi eleman entwodiksyon

Avantaj pwodwi yo

Nou kwè ke patenarya peryòd tan vaste ka yon rezilta nan bon jan kalite siperyè, pri ajoute sipò, rankont chaje ak kontak pèsonèl pou Pri fiks Konpetitif Prefabrike Steel Bailey Bridge Steel Bridge Design Bailey Bridge Construction, Prensip Nwayo Antrepriz nou an: Prestige la 1st ; garanti; Kliyan an siprèm.
Pri fiks konpetitifLachin Bailey Steel prefabrike pon ak Bailey Bridge Pri, Pou travay ak yon manifakti machandiz ekselan, konpayi nou an se pi bon chwa ou. Byenveni ou ak ouvèti fwontyè kominikasyon yo. Nou se patnè ideyal nan devlopman biznis ou epi gade pou pi devan pou koperasyon sensè ou.


  • Previous:
  • Pwochen: